News

AutoISO Case Study

Plugging Into Time Savings and Accuracy for Cable testing

It’s Time for Faster, More Reliable Acceptance Testing

AutoISO-case-study_01.jpgCables and other parts of electric network have been fitted and your system is ready to be energized. Before you energize the lines, you have to run acceptance tests.

Read more ...

Do you know how? Perform NEC 220 Connected Load Studies? We do!

The most commonly performed power monitoring or logging study! Connected load studies are needed to determine whether new loads and breakers can be added to a panel. Most of you may know the measurements are based on collecting average amps data over 15-minute intervals, continuously recorded over 30-days. But there's more to it! Go here to find out: CONNECTED LOAD STUDIES – NEC 220.87 and choose the right power logger for panel capacity / current logging studies.